Q-2, r. 9.01 - Design code of a storm water management system eligible for a declaration of compliance

Full text
53. The plantation plans and specifications of a storm water management work must
(1)  indicate and locate the plants to be planted;
(2)  specify the composition and depth of the growth substrates;
(3)  indicate the methods for the planting of substrates and plants; and
(4)  indicate the plant storage methods.
The plantation plans and specifications of the grassed ditch for hydrological zones 2 and 3, except accesses provided for maintenance, must be prepared by a person holding a university diploma in landscape architecture, biology or in the forest field, or under the person’s supervision.
O.C. 871-2020, s. 53.
In force: 2020-12-31
53. The plantation plans and specifications of a storm water management work must
(1)  indicate and locate the plants to be planted;
(2)  specify the composition and depth of the growth substrates;
(3)  indicate the methods for the planting of substrates and plants; and
(4)  indicate the plant storage methods.
The plantation plans and specifications of the grassed ditch for hydrological zones 2 and 3, except accesses provided for maintenance, must be prepared by a person holding a university diploma in landscape architecture, biology or in the forest field, or under the person’s supervision.
O.C. 871-2020, s. 53.